Women’s Leadership: A new winning equation in the Lake Chad Basin and the Mano and Mono River BasinsRead More
Do needs motivate the exchange of data in transboundarywaters? Insights from Africa’s shared basinsRead More
An Uncertain Future: Biodiversity and Livelihoods along the Mekong River in Northern Lao PDRRead More
Final Report: Rapid Environmental Flow Assessment for Huong River Basin, Central Vietnam (2004)Read More
Plan de monitoreo para sistemas de abastecimiento de río o nacimiento en el Sur de Ahuachapán, El SalvadorRead More
Plan de monitoreo para sistemas de abastecimiento de pozos perforados en el Sur de Ahuachapán, El SalvadorRead More
Análisis de las relaciones de equidad de género en el uso y manejo del agua en las poblaciones rurales del sur de Ahuachapán, El Salvador, C.A.Read More
Testimonio histórico sobre los recursos naturales de la Barra de Santiago, El Salvador, C.A.Read More
Plan de monitoreo para la planta de tratamiento de aguas residuales en el sur de Ahuachapán, El Salvador, C.A.Read More
Governance of the Ganges River Basin: a comparative analysis of water agreements and the UN Watercourses ConventionRead More
Measuring, understanding and adapting to nexus trade-offs in the Sekong, Sesan and Srepok Transboundary River BasinsRead More
Transforming coffee and water use in the Central Highlands of Vietnam: case study from Dak Lak Province (2020)Read More
Presentation at 4th SADC Groundwater Conference 2021: Understanding BRIDGE Tools – A Research PerspectiveRead More
Quantifying performance to help address reservoir operation challenges in Kenya’s Tana basinRead More
Investir dans les infrastructures hydriques dans un contexte de changement climatique: Ghana (2017 – ODI Note d’information)Read More
Local-level investments in natural water infrastructure – Tana Basin (2017 – BC3 Working paper)Read More
Baseline Review and Ecosystem Services Assessment of the Tana River Basin, Kenya (2015 – IWMI Working Paper)Read More
Situation Analysis on Water, Food Security, Poverty, Ecosystems for Life: A Bangladesh-India InitiativeRead More
Quantifying the Services of Natural and Built Infrastructure in the Context of Climate Change: The Case of the Tana River Basin, KenyaRead More
Building an enabling environment for water, energy and food security dialogue in Central Asia : capacity needs assessmentRead More
Regional institutional arrangements advancing water, energy and food security in Central Asia : institutional gap analysisRead More
Increasing returns on investment opportunities by applying a nexus approach : best practice nexus case studiesRead More
Dependence of Riparian Communities on Ecosystem Services in Northern Ghana (2017 – IWMI Working Paper)Read More
Benefits From Water Related Ecosystem Services in Africa and Climate Change (2018 – Journal Article)Read More
Application of soil and water assessment tool (SWAT) for modelling hydrological outputs in Tana River Basin (2017)Read More
The urban–rural water interface: A preliminary study in Burkina Faso (ODI Working Paper, 2015)Read More
The role of ‘nature-based solutions’ for climate change adaptation and sustainable development in the Volta and Tana river basinsRead More
Making water infrastructure investment decisions in a changing climate: A political economy study of river basin development in KenyaRead More
Making water infrastructure investment decisions in a changing climate: A political economy study of river basin development in GhanaRead More
Fostering cooperation on transboundary waters: Success stories from the Swiss Agency for Development and Cooperation (SDC) Global Programme WaterRead More
Building dialogue to enhance governance of shared water resources in the Mano and Moa/Makona transboundary basinsRead More
The 3S River Basin: Cambodia, Lao PDR and Vietnam – Creating spaces for cooperation through multi-level dialogues and capacity buildingRead More
A window of opportunity for the Mekong Basin: the UN Watercourses Convention as a basis for cooperationRead More
Sekong, Sesan and Srepok Basin: An assessment of freshwater ecosystem health in the Lower MekongRead More
Strengthening CSO engagement in water governance: Government strategies and perception of CSOs in the Ganges-Brahmaputra-Meghna BasinRead More
Contribution and influence of CSOs on water governance in the Ganges Brahmaputra-Meghna basinRead More
The Sekong River in Vietnam, Lao PDR and Cambodia: An Information Sourcebook for Dialogue on River Flow ManagementRead More
Strategic priorities for trans-boundary water cooperation in the Sekong, Sesan and Sre Pok (3S) BasinsRead More
Bâtir le dialogue pour améliorer la gouvernance transfrontalière des ressources en eau dans le BLTRead More