All things being normal, in about 15 months from now construction works will start on the Pwalugu Multi-purpose Dam (PMD) on the White Volta River, a tributary of the Volta that passes through Pwalugu along the Tamale – Bolgatanga highway in the Upper East Region. The Volta River Authority (VRA) is the implementing agency of the dam, for which preparatory work is steadily progressing. And as it was with the construction of its two sister dams – Akosombo and Bui, communities around the catchment area are in a high state of expectancy that includes a possibility of a “new and better” way of life.